Archives for 2016

jord wood watch + a giveaway

Have you seen these amazing wood watches all over social media?!

screen-shot-2016-09-08-at-1-22-40-pm

I’ve admired them from afar for quite a bit. But a few weeks ago, JORD asked me to review one of their watches!

Talk about a happy mail day when this beauty arrived in my mailbox!

img_9517

I think it’s even prettier in person.

I selected the Fieldcrest watch in zebrawood and maple.  I love the color variation of the wood.

I feel like this isn’t just any ol’ watch either.   It’s interesting. It’s WOOD!

* The wood comes from West Africa {how cool is that!?}

*The natural zebrawood and maple are hand treated with tung oils

*It comes with a scratch resistent mineral glass (I don’t know about you, but I’ve had a scratched watch face before and it flat out stinks!)

p4930448

My personal favorite things about this watch are:

*It feels like a decorative bracelet, yet it’s so functional! It’s another beautiful piece of jewelry.

*It’s a conversation piece!  I’ve had lots of comments and questions about this cute thing.

*And it’s SO LIGHTWEIGHT!  Honestly. Whenever someone comments on my watch, I take if off and show them how light it is.  I’m barely aware that it’s on my wrist.

So now to the exciting part! JORD is doing a giveaway!!  The contest winner gets a $75 e-gift code to the JORD shop.  And all other entrants (Did you  read that?! ALL OTHER ENTRANTS!) will receive a $20 e-code just for entering the drawing.  It’s a win-win either way! You either get a $20 discount – or a $75 discount!

To enter click the image below:

screen-shot-2016-09-08-at-5-36-29-pm

 or go to this link:  https://www.woodwatches.com/g/athomeinthenorthwestblog

The contest will close on September 18th at 11:59 pm.  Both the $75 and $20 codes will expire on January 31, 2017.

. . . this post was sponsored by JORD wood watches . . .

Master Bath Renovation – Week 9

Things continue to progress with the master bathroom project.  Slowly.  But it’s progress nonetheless.

I think we’re nearing the end.

Only a few more weeks.  But didn’t I say that a few weeks ago?!  Oh well. Hopefully only a few more weeks.

Our windows are stuck in a truckers strike. Seriously.

So we are waiting for the windows. Because they can’t put trim up until the windows are installed. And they can’t paint the bathroom until the trim is installed….I think you get the point.

But we have some forward progress and it’s pretty exciting.

Countertops got installed.  Bathroom faucets too.

IMG_8571

I love the handles!

The shower fixtures were {mostly} installed. A tile cracked so now that the tile is fixed, they can come finish the plumbing fixtures.

P4910223

 And quartz was put on the shower seat and ‘curb’ going into the shower.

P4910201

Quartz was also put around the tub.

P4910178

As you can see, we’re nearing the finish line!!

I have some friends coming to town mid July and the contractor tells me we SHOULD be done by then!

I hope….

jen

Master Bath Renovation – week 6

Here we are, six weeks into the bathroom renovation.  This week, things really started coming together because…

…our tile was installed!

I love seeing a vision come to life. Something that was once on paper, slowly installed and creating a real life visual.

Pretty exciting.

I’m just going to dive right into the pictures. Because that’s what everyone wants to see, right?!

You may have seen this one on instagram…

our floors!

IMG_8382

And the shower….

(please pardon the iphone pics)

IMG_8421

IMG_8424

IMG_8425

What do you think?!

I absolutely love it.

Every bit.

Counters and sinks were installed yesterday. So make sure you come back next week for a week 7 update!

jen

If you’ve missed previous weeks, click below:

week 1, week 2, week 3/4, week 5

Master Bath Renovation – week 5

This wasn’t the most exciting week on the renovation home front.  Our tile was backordered.

Ugh.

The first backorder date was May 18th. Then it was due on the 20th. Then it was supposed to be  in on the following Monday, available to be picked up Tuesday. And so on and so on and so on.

Finally, Friday the tile arrived!

In preparation for the tile, the subfloor was laid down (that’s the orange part). And the heating element for the floors was woven in as well (that’s the red wire).

IMG_8298

Now you’re probably saying “Show me the tile!”

That’s what I’ve been saying all week long.

Here’s a sneak peak.

Screen Shot 2016-05-29 at 2.18.23 PM

The 2″ white hex will go all over the bathroom floors.  The shower floor will have a cement look with this 2″ gray mosaic.  The shower walls and  counter/bathtub backsplash will be white subway tile. And the shower niche will provide a bit of contrast and interest with this carrera marble.

I’ve got my fingers crossed that we get some tile laid this week!

jen

If you missed any of the past weeks of the master bathroom renovation, click below for:

week 1week 2week 3/4

Master Bath Renovation – Week 3 and 4

We’re one month into the bathroom renovation.  While week 3 did have some forward progress, it didn’t produce the most exciting of pictures. So I’m combining my post to include weeks 3 and 4.

If you’re just joining me, or in case you forgot, here are before pictures for you.  I wish they were worse pictures so you could really appreciate the age and status of the bathroom. But the light was (surprisingly) shining bright that day, washing out the striped wall paper.  And you can’t see the broken towel bars.  Though if you do look closely, you see a broken light on the far right.   Now that I’ve pointed out all the bad parts, here are the before pictures:

P4900903

P4900893

And here are a few inspiration pictures for you to see where we are headed:

Screen Shot 2016-05-01 at 10.51.02 PM

Now on to the exciting part…current day!

They cut the hole for the bathtub and put up the wood trim on the outside of the tub area.

IMG_8213

And the shower made some progress too.  I’m not sure what you officially call this step, but it started to look more like a shower. So that’s a plus in my book!

IMG_8214

And the cabinet installation is now complete too.

IMG_8215

The tile arrives tomorrow. So I’m hoping we see some tile installation this week!

Stay tuned for more progress next week.

If you missed a previous post, click HERE for week 1. And HERE for week 2.

jen

Master Bath Renovation – Week 2

With Mother’s Day, I slacked on writing my week 2 master bathroom update! But things are moving right along.

I mentioned last week about my decision to shiplap or not to shiplap.  And after stewing about it one entire day, we said yes.  So this past week was mostly about getting the shiplap on the walls!

First of all, some of you may be asking “What is shiplap?”  Basically, it’s wood planking.

Let me know you a few inspiration pictures before we see my bathroom.

Cement+tile+and+Shiplap+Bathroom+by+Studio+McGee

studio mcgee

 

cottage-modern-bathroom

via the inspired room

Aren’t those bathrooms lovely!?

So you can imagine my excitement when I saw this laying in my driveway last week!

The shiplap arrived!!!

IMG_7990

It took most of the week to get it on the walls.  And while these may not be the worlds most exciting images to you, they’re pretty fun for me!

IMG_8038

IMG_8042

I had a few people confused about my bathtub, one of which was my son.  He thought we might climb up a ladder to get into our new bathtub!  A hole will actually be cut for the tub and the tub dropped INTO the hole. So it will be a regular ol’ bathtub. Not a fun ladder/slide combo. Though that would be fun! Just probably not safe.

Also, the walls will be painted! My mom already told me that the bathroom looked like a sauna.  That’s only temporary! The room will be brighter and whiter when it’s finished.

My light fixtures arrived too.  I love them.  Though I’m questioning how they will fit with the rest of the bathroom.  They’re an dark/blackish color. Not a rubbed bronze.  Restoration Hardware calls it Aged Steel.

IMG_8040

Sherry Hart with Design Indulgence says that every room needs a little bit of black. So I’m hoping that these lights will coordinate ok and not look out of place.   Also, the curtain hardware will be black/aged steel, as will the hooks for our bath towels.  So I think in the end, it’ll all work together just fine.

So that’s it for week 2!  Yesterday started with a day of cabinet assembly!  Make sure you come back next week for another update.

If you missed it, click here to read about he master bathroom week 1 update.

jen

Master Bath Renovation – Week 1

Our master bathroom is old. Almost 20 years old to be exact.  While the colors were neutral, the striped wallpaper and gold accents have filled their duty and it was time for them to go.

For years, we’ve talked about renovating.  We’ve gotten bids.  Then we’ve done nothing.  But this past week, our time came!

I emptied the bathroom of all its clutter and decor.  The kids peel off loose pieces of wallpaper. And last Monday, the demolition began!

Here are a few before pictures (Due to the light from the windows, you can’t fully experience the striped wallpaper. My apologies!)

P4900893

P4900903

The new bathroom will still be very neutral. White subway tile with gray grout.  A 2″ hexagon tile on the floor.  Carrara Marble in the shower niche for our soap and shampoo.

I pulled together a few inspiration pictures to help share my vision…

Screen Shot 2016-05-01 at 10.51.02 PM

 We wavered back and forth on adding shiplap to the walls.  And after much discussion and deliberation, we says yes to shiplap.

By the end of day one, this is what the bathroom looked like…

IMG_7895

It amazed me how quickly the room got emptied!

It was pretty much a gutted shell of a bathroom, with the exception of the two shower walls.

By the end of day two, they had built a new tub surround (we’re getting an oval soaker tub instead of a corner jetted tub).  The shower was also made a bit deeper.

IMG_7926

And the dumpster out front, is full of the remnants of our old bathroom.

IMG_7936

The builder should be here again tomorrow.  They’ll be putting up shiplap as well as delivering the bathroom cabinets!

I’ll post another update at the end of the week.

Thanks for following along!

jen

Related Posts Plugin for WordPress, Blogger...